La Lonja de la Innovación launches a new challenge for projected road signage in solid bulk docks

La Lonja de la Innovación launches a new challenge, promoted by the Port of Huelva, aimed at entrepreneurs, SMEs, and research groups to encourage creativity and technological development applied to a port environment.

The objective is to implement a paid pilot project of €15,000 (incl. VAT) in a port environment that develops an innovative solution capable of signposting and organizing the traffic of vehicles, machinery, and pedestrians in solid bulk docks using light projection systems.

Context of the Port of Huelva challenge

Solid bulk docks in the Port of Huelva are areas of high operational activity where heavy machinery, trucks, and workers interact. Therefore, they require efficient road organization to minimize risks and ensure operational safety. However, there are particular challenges to addressing this:

  • Open space: docks must make the most of surface area and, therefore, minimize physical elements on the ground. This makes installing traditional signs difficult.
  • Impracticability of painting surfaces: painting signs directly on the ground is ineffective, as bulk cargo quickly covers the markings.
  • Existing infrastructure: although the docks have lighting towers, sheds, and conveyor belts, these structures have not been utilized to facilitate road organization.

In this context, La Lonja de la Innovación is launching a new challenge titled "Projected Road Signage in Solid Bulk Dock Operations Area". If you believe you have a solution that could address this challenge and would like to participate, you can do so through our website, where you can also read all the details.

Key information about the challenge

To provide a solution for properly signposting solid bulk docks, La Lonja de la Innovación is looking for an innovative proposal that must meet the following requirements:

  • High-visibility light projection. The proposed solution must use high-intensity laser or LED devices visible even in bright daylight conditions without interfering with traditional dock lighting. Other technologies will also be considered.
  • Integration into existing infrastructure. Existing lighting towers, sheds, or conveyor belts at the docks should be utilized, minimizing the need for additional installations and ensuring projectors are protected from collisions.
  • Adaptive traffic management. The solution must implement projected signage for lanes, waiting areas, and pedestrian crossings. It should include signs like Stop or Yield activated by sensors or radars detecting approaching vehicles or pedestrians.
  • Ease of installation and maintenance. The solution must be easy to install and operate under the specific conditions of the docks, ensuring durability against environmental demands.

Additionally, the winner of this challenge must provide the following deliverables:

  1. Supply, configure, and install the sensing equipment to cover the challenge requirements.
  2. Integrate these systems.
  3. For the pilot, displaying one traffic sign and projected signage in lanes and/or pedestrian crossings will be sufficient.

The winning project of this challenge will receive a maximum amount of €15,000 (incl. VAT) to develop their proposal and implement a pilot at the Port of Huelva. You can review the full terms and conditions on our website (the terms will be linked here).

If you are interested in participating in this challenge, submit your proposal via email before DATE: info@lalonja.tech